Toro Z Master Z400 Series Service Manual page 117

Hide thumbs Also See for Z Master Z400 Series:
Table of Contents

Advertisement

ENGINE
7. Apply a thread locking compound to the clutch
retainer bolt (Fig. 319).
8. Install the center bolt and two spring washers that
hold the electric PTO clutch to the engine crankshaft
(Fig. 320).
5
5-30
Fig 319
PICT-0026c
Fig 320
PICT-0014c
9. Torque the center bolt to 55 ft-lbs. (Fig. 321).
Fig 321
10. Plug the clutch pigtail harness into the main harness
(Fig. 322).
Fig 322
Z Master Z400 Service Manual
PICT-0027c
PICT-0100a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z 400 estate seriesZ 450 pro performance seriesZ 100 seriesZ 440 pro value series

Table of Contents