Turning the Analyzer On and Off
Side Panel
Connector
Ethernet port
RS-232 connector
Turning the Analyzer On and Off
Turning the Analyzer On
1.
Place the computer, monitor and printer ON/OFF switches in the ON position.
2.
Place the analyzer ON/OFF switch in the ON position.
Do not turn off the analyzer while initialization is in progress. Doing so may damage the
instrument.
3.
Turn on the pump. The pump must warm for approximately two hours before performing
analyses. For analyses that require very precise results, allow the analyzer to warm up while the
sample is being prepared.
2-4
Port for an Ethernet cable allowing communication between the analyzer
and the computer.
Used by service personnel to perform calibration procedures.
Ethernet port
RS232 connector
Description
TriStar II 3020
302-42828-01 - Dec 2012
Need help?
Do you have a question about the TriStar II 3020 and is the answer not in the manual?