Connecting Gases
2.
Click the down arrow to the right of the Test field and select Clean and Verify Analysis Gas
Line Rev [n] Test Rev [n].
3.
Click Report after analysis and select Preview as the destination. Click OK.
4.
Click Start. From the View dropdown list, select either Operation, Instrument Log, or
Instrument Schematic. Refer to
5.
A series of prompts display on the screen requiring operator response. The length of time a test
will run is also indicated on the screen.
6.
A popup window indicates the test is complete. Click OK. The report displays on the screen.
On the report, the Leak Rate field on the Instrument to Regulator Shut-off Valve -1 report
should read Passed. A Passed reading indicates the gas line from the instrument to the regulator is
clean and leak-free.
9-22
Analysis, page 6-2.
Sample
TriStar II 3020
302-42828-01 - Dec 2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TriStar II 3020 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF