(11) During the loading process the Progress column displays the installation progress and the time
remaining is displayed for each remaining database to be loaded, shown in Figure 7-19.
(12) When the database loading is complete, a pop-up window is displayed as shown in Figure 7-20.
(13) Remove the USB drive, remove power from the KSD 100EXP, wait 10 seconds, and power the
KSD back on.
(14) Review and acknowledge the updated dates and effectivity ranges shown on the Database
Acknowledge Screen (refer to Figure 6-3).
89000109-002
Rev 2
© Honeywell International Inc. Do not copy without express permission of Honeywell.
For Use in Non-Certified Aircraft
Figure 7-19 Database Loading in Progress Screen
Figure 7-20 Database Loading Complete
xVue Touch Installation Manual
Page 7-18
Need help?
Do you have a question about the XVUE TOUCH and is the answer not in the manual?