6 Programless Communications
(5) Transfer the project that was created on the Sysmac Studio to the PLC.
−
Select Controller
Online from the menu bar to go online and then select Controller-
−
To Controller. The Transfer to Controller Dialog Box will be displayed. Click the
Transfer
Execute Button to transfer the project to the Controller.
A message saying that forced status will be canceled will be displayed. Click the Yes
Button.
If a dialog box that says execution ended normally is displayed, the transfer has been
concluded. Click the OK Button.
6 - 42
E5@D Digital Temperature Controllers Communications Manual (H225)
Need help?
Do you have a question about the E5 D Series and is the answer not in the manual?