Commissioning Access Control Components - Huawei FusionModule1000A Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
Step 5 (Optional) If multiple iBOXs are cascaded, repeat
remaining iBOXs and iBATs.
----End

8.3.3 Commissioning Access Control Components

Prerequisites
Preparations
Tools: step ladder, Phillips screwdriver
Documents: monitoring device layout diagram, emergency exit diagram
Skill requirement: weak-current engineer familiar with the management system
Procedure
Step 1 Open the physical lock.
Step 2 Open the magnetic door lock by swiping an IC card.
Step 3 Rotate the door handle clockwise and pull open the pre-fab. module door.
Step 4 Enter the pre-fab. module and close the module door.
Step 5 Push the emergency exit rod, and check whether the emergency exit door opens properly.
Step 6 Verify that the management system generates a door open alarm.
Step 7 Press the exit button and push open the pre-fab. module door.
Step 8 Close the pre-fab. module door, and open the cover of the emergency door release button.
Step 9 Remove the cover of the emergency door release button using a Phillips screwdriver, remove
the glass, and rotate the door handle clockwise to open the pre-fab. module door. If the door
can be opened, the emergency door release button is working properly.
Issue 02 (2019-12-20)
You have powered on the access control system.
You have configured the IC cards.
For the diagrams, see the initial configuration parameter manual for the solution in use.
If you do not open the pre-fab. module door in 6s after swiping the card, the electromagnetic lock locks
the pre-fab. module door again.
Normal response: The pre-fab. module door can be opened, and the management system logs the door
opening event.
Normal response: The pre-fab. module door can be opened, and the management system logs the door
opening event.
Copyright © Huawei Technologies Co., Ltd.
8 Commissioning Core Components
Step 1
to
Step 4
to perform networking for
80