FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
Figure 7-14 Connecting cables to the electromagnetic valve
Step 14 Remove the safety pin after verifying that the fire extinguishing system is working properly.
Verify that the safety pin is removed after the fire extinguishing system is commissioned,
accepted by the customer, and working properly; otherwise, the electromagnetic valve may
fail to start, and extinguishant may fail to be released in the case of fire.
1.
Issue 02 (2019-12-20)
Remove screws securing a safety pin.
Copyright © Huawei Technologies Co., Ltd.
7 System Commissioning
45