Step 4 (Optional) If initial configurations are involved, verify that the initial parameter settings are
correct.
For details about initial configurations, see the initial configuration parameter manual for
the solution in use.
Initial configurations must be verified before the first power-on after installation or restart
after a long power-off period.
Equipment with initial configurations can be powered on only after the initial
configurations are verified
----End
Issue 02 (2019-12-20)
Check
Check Item
Sub-item
Emergency
Power indicator
light
Fire alarm bell
Alarm indicator
on the
Extinguishant
extinguishant
abort button
control panel
Pneumatic
switch
Electrical
actuator
Horn strobes
Warning sign
VESDA power
VESDA
box
power-on
commissioning
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Criteria
The power indicator is on.
The alarm indicator is off.
The VESDA power indicator is
on, and there is no alarm in the
management system.