Huawei FusionModule1000A Commissioning Manual page 34

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
System
Management
system
Fire
extinguishing
system
(Standard)
Fire
extinguishing
system (CE)
Lighting system
Issue 02 (2019-12-20)
Check Item
Operation Method
smart cooling products.
Component
Check the monitoring
installation and
device installation and
connection
connection.
Device
Check the fire
installation and
extinguishing device
cable
installation and cable
connections
connections.
Device
Check the fire
installation and
extinguishing device
cable
installation and cable
connections
connections.
Component
Check the lighting device
installation and
installation and
connection
connection.
Copyright © Huawei Technologies Co., Ltd.
5 Check Before Power-On
Reference
drainpipe are properly
installed, and the thermal
insulation layers are
intact.
Devices are installed
securely as shown in
the monitoring device
layout diagram.
Cables are correctly
connected.
The pressure pointer
of the fire cylinder is
in the green zone.
The dowel of the fire
cylinder is properly
installed and intact.
All cables are
correctly and securely
connected.
The pressure pointer
of the fire cylinder is
in the green zone.
The dowel of the fire
cylinder is properly
installed and intact.
All cables are
correctly and securely
connected.
Devices are installed
in positions shown in
the lighting device
layout diagram.
Cables are correctly
connected.
27