FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
System
Fire
extinguishing
system
(Standard)
Fire
extinguishing
system (CE)
Issue 02 (2019-12-20)
Check
Check Item
Sub-item
Fire alarm
Indicators on the
control panel
fire alarm
control panel
Smoke detector
Indicator
Heat detector
Indicator
Emergency
Power indicator
light
Fire alarm
Alarm indicator
sounder
on the fire alarm
control panel
Extinguishant
abort button
Pressure
Announciator
Electromagneti
c Valve
Fire Alarm
Horn
Gas Release
Indicator
Extinguishant
Indicators on the
control panel
extinguishant
control panel
Smoke detector
Indicator
Heat detector
Indicator
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Criteria
be opened from outside the
pre-fab. module using an
access card, and door opening
operations are logged in the
management system.
The pre-fab. module door can
be opened from inside the
pre-fab. module using the exit
button, and door opening
operations are logged in the
management system.
Indicators on the fire alarm
control panel:
The power indicator is on.
The alarm indicator is off.
The indicator blinks once every
6s.
The indicator blinks once every
6s.
The power indicator is on.
The alarm indicator is off.
Indicators on the extinguishant
control panel:
The power indicator is on.
The alarm indicator is off.
The indicator blinks once every
6s.