Summary of Contents for Huawei FusionModule1000A40
Page 1
FusionModule1000A40 Prefabricated All-in-One Data Center V200R003C10 Initial Configuration Parameter Manual Issue Date 2021-02-10 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
● You can modify initial configurations under the guidance of Huawei engineers. Huawei assumes no liability for any loss caused by unauthorized changes to the initial configurations. ● Some parameters mentioned in this document should be provided and configured by onsite technical support engineers based on the actual application of the data center.
Page 9
List of Initial Configuration Parameters Category Diagram ID Diagram Name Detailed Initial Configuration Parameters No.P001 Power Supply and Distribution Device Layout Diagram No.P002 Power Supply and Distribution System Diagram Initial Configurations for the Power Supply and Initial Configuration Parameters for an Integrated UPS Distribution System Initial Configuration Parameters for Power Supply and Initial Configuration Parameters of the Electric Heater Temperature...
Page 10
No.P001 Power Supply and Distribution Device Layout Diagram Air outlet window WY-10A WY-10A Socket-1(Right for maintenance) Socket-2(PAD) UPS Battery Cabinet-1 UPS-1 Fan-2 Fan-1 Power window Signal window Power PDB-1 Power PDB-1 XSEC0014-XSEC0014...
Page 11
No.P002 Power Supply and Distribution System Diagram AC PDB-1 Air Conditioner IT Load 1 IT Load 2 distribution Module distribution Module distribution Module BBB-1 MCB C32A/4P In=20kA, Imax=40kA ATS/400A/4P UPS-1 Power PDB-1...
Page 12
Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices Device Name Project Configuration Quantity Power Distribution Device Name Remarks 8D ATS ■Involved □Not involved UPS-1 Integrated UPS ■Involved □Not involved UPS-1 Electric heating ■Involved □Not involved Air Intake Window Electric Heater Note: The following device parameters are not all parameters of the devices.
Page 13
Component Main PDF-1 Initial Configuration Parameters for 8D ATS Parameter Category Default Value Value Range Setting Remarks Password 0001 Default Value 100/57 V-115/66 V-120/70 V-208/120 V-220/127 V-230/132 V-240/138 V-277/160 V- Rated Voltage 400/230 V 380/220 V 347/200 V-380/220 V-400/230 V-415/240 V-440/254 V-480/277 V Rated Frequency 50 Hz 50 Hz, 60 Hz...
Page 14
Category Parameter Default Value Value Range Setting Remarks Freq Hysteresis Min LN1 -3.0% -9.8% to -0.8% -3.0% Freq Hysteresis Min LN2 -3.0% -9.8% to -0.8% -3.0% Frequency Hysteresis Freq Hysteresis Max LN1 +3.0% +0.8% to +9.8% +3.0% Freq Hysteresis Max LN2 +3.0% +0.8% to +9.8% +3.0%...
Page 15
Component UPS-1 Integrated UPS (25 kVA-125 kVA) Initial Configuration Parameters Default Parameter Category Value Range Setting Remarks Value 12 languages, including English, Language English English Chinese, Italian, and so on Basic Password 000001 Default value Single/Parallel Single Single, Parallel Single Output voltage level 400 V 380 V, 400 V, 415 V...
Page 16
Default Category Parameter Value Range Setting Remarks Value User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Enable Disable/Enable/User-defined branch circuit breaker in the Installation time PDU > Branch Battery conceptual enable diagram and enable the branch circuit breaker that connects to a load.) User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Enable...
Page 17
Initial Configuration Parameters of the Electric Heater Temperature Controller for Air Inlet Windows Category Item Default Value Value Range Factory Setting Remarks Specified value –55°C to 99°C 25°C Temperature difference 2.0°C 0.1°C to 25°C 20°C Anti-frequent–startup delay 0–50 min Adjustment parameters Probe error, compressor running time 0–99 min Probe error, compressor stop time...
Page 18
No.C001 Cooling Device Layout Diagram Air outlet window Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm UPS Battery Cabinet-1 UPS-1 RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT CRAC-B1 CRAC-C1 Fan-2 CRAC-A1 CRAC-D1 (With Electric Heating & (With Electric Heating &...
Page 19
Table 2 Initial Configuration Parameters for Cooling Devices Initial Configuration Parameters of Remote Temperature and Humidity Sensor DIP Switches for In-row Air Cooled Smart Cooling Product DIP Switch Sequence No. Sensor Name and No. Address Remote humidity and temperature sensor 1...
Page 20
Initial Teamwork Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Number of Cold aisle Hot aisle Teamwork Teamwork Teamwork Total Number Rotation Rotation Forced Requirement Cascade Cooling Network Running Rotation temperature and temperature and Group No. Unit Address Function of Units Period Time...
Page 21
Initial Temperature and Humidity Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Cooling Product Humidifier& electric heater Cold aisle sensor 1 Temperature and humidity control type Temp control mode Cold-aisle temp set point Cold-aisle Humid Set Point Disable Maximum Enable Average Enable...
Page 22
No.M001 Monitoring Device Layout Diagram Air outlet window Door Status Sensor-1 DOOR Door Status Sensor-2 DOOR Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm Magnetic Lock-1 UPS Battery Cabinet-1 UPS-1 Light-1 Exit Button-1 DOOR EXIT BREAK GLASS Emergency Door Release-1 Reader-1 Water Sensor...
Page 23
No.M002 Monitoring System Network Diagram Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved LAN Switch Server Reserved Server_Mgmt Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Door Status Sensor-1 Reserved Reserved LOCAL FIRE Extinguishant Control Panel (CE) FAULT RELAY ECC800 BACK Collector_ECC800 Reserved...
Page 24
Server 2288X V5 https://192.168.9.11 User name:admin 1 or 2 LAN Switch Port1 User name: root Password: Password: Changeme_123 Huawei@123 2. PowerEcho maintenance tool: IP address of the https://Neteco server: 31945/ User name: admin Password: Changeme_123 WAN_1:192.168.8.10 WAN_2:192.168.0.10 User name:admin Collector_ECC8 Collector_ECC8 LAN_1、LAN_2:192.168.248.10...
Page 25
Port to WebUI User Upper- Monitoring Data Device Device Device IP Device Alarm LCD User Name Upper- Upper-Level Device Model Name and Transfer Level Remarks Device Type Name Name Address Address Threshold and Password Level Device Port Password Port Device Device User name:Admin Settings >...
Page 26
After a camera is commissioned, label the camera with its name and IP address. Remarks: Camera commissioning: Obtain the IP address automatically allocated by the ECC800 to the camera through Huawei IPC TOOL. Then access the camera on the WebUI over Remarks: the IP address to configure the internal IP address.
Page 27
No.F001 Fire Extinguishing Device Layout Diagram (CE) Air outlet window EXIT-1 Emergency Lighting -2 EXIT Fire Alarm Bell-1 Horn Strobes-1 Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS Battery UPS-1 Cabinet-1 Smoke Detector-1 Smoke Detector-2 Smoke Detector-3 Smoke Detector-4 Smoke Detector-5...
Page 28
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -1 Horn Strobes -2 Horn Strobes -1 Terminal Resistor Warning Signs-1 Terminal Resistor Terminal Resistor 6.8K 6.8K COMM+LEV1 LEV2 2WIRE SILENCE COMM+ LEV1 LEV2 2WIRE SILENCE Terminal Resistor pneumatic switch-1 6.8K Extinguishant Abort Button Fire Alarm Bell-1 To Monitoring system 6.8K...
Page 29
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -2 Smoke Smoke Smoke Smoke Smoke Detector-1 Detector-5 Detector-4 Detector-3 Detector-2 L1 IN L1 IN L1 IN L1 IN L1 IN Terminal Resistor 6.8K L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT black black...
Page 30
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -3 AC PDB-1 Relay AC PDB-1 DC24V- DC24V+ black black DATA POWER ZONE 1 ZONE 2 ZONE 3 MODE EXTING EXTRACT FAULT LOCAL FIRE REMOTE HOLD PRESS PRESS SOUNDER STAGE STAGE SELECT RELEASE RELAY FIRE RELAY...
Page 31
No.L001 Lighting Device Layout Diagram Air outlet window Lighting-25 Lighting-26 Lighting-27 Lighting-28 Lighting-29 Lighting-30 Lighting-31 Lighting-32 Lighting-33 Lighting-16 Lighting-17 Lighting-18 Lighting-19 Lighting-20 Lighting-21 Lighting-22 Lighting-23 Lighting-24 UPS Battery Cabinet-1 UPS-1 Lighting-15 Signal window Power window Power PDB-1 XSEC0014-XSEC0014...
Page 32
No.F003 Emergency Exit Diagram Air outlet window Exit Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS Battery UPS-1 Cabinet-1 CRAC-B1 CRAC-C1 Fan-2 CRAC-D1 CRAC-A1 (With Electric Heating & (With Electric Heating & (25KW) (25KW) Fan-1 Humidifier 25KW) Humidifier 25KW) Power...
Page 34
List of Initial Configuration Parameters Category Diagram ID Diagram Name Detailed Initial Configuration Parameters No.P001 Power Supply and Distribution Device Layout Diagram No.P002 Power Supply and Distribution System Diagram Initial Configurations for the Power Supply and MCCB Current Parameter Settings Distribution System Initial Configuration Parameters of the Electric Heater Temperature Initial Configuration Parameters for Power Supply and...
Page 35
No.P001 Power Supply and Distribution Device Layout Diagram Air outlet window WY-10A WY-10A Socket-2(PAD) Socket-1(Right for maintenance) UPS-2 UPS-1 Fan-2 Fan-1 Signal window Power window Power PDB-1 XSEC0014-XSEC0014...
Page 36
No.P002 Power Supply and Distribution System Diagram AC PDB-1 Air Conditioner distribution Module IT Load 1 distribution Module IT Load 2 distribution Module IT Load 2 distribution Module IT Load 1 distribution Module Air Conditioner distribution Module BBB-1 MCB C32A/4P MCB C32A/4P In=20kA, In=20kA,...
Page 37
Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices Device Name Project Configuration Quantity Power Distribution Device Name Remarks Integrated UPS ■Involved □Not involved UPS-1/2 MCCB ■Involved □Not involved UPS-1/2 QF Electric heating ■Involved □Not involved Air Intake Window Electric Heater Note: The following device parameters are not all parameters of the devices.
Page 38
Component UPS-1/2 Integrated UPS (25 kVA-125 kVA) Initial Configuration Parameters Default Parameter Category Value Range Setting Remarks Value 12 languages, including English, Language English English Chinese, Italian, and so on Basic Password 000001 Default value Single/Parallel Single Single, Parallel Single Output voltage level 400 V 380 V, 400 V, 415 V...
Page 39
Default Category Parameter Value Range Setting Remarks Value User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Eable Disable/Enable/User-defined branch circuit breaker in the Installation time PDU > Branch Battery conceptual enable diagram and enable the branch circuit breaker that connects to a load.) User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Eable...
Page 40
Component UPS-1/2 QF MCCB Current Parameter Settings Category Parameter Default Value Value Range Setting Remarks 0000–1111 L overload protection (DIP switch setting) 1111 0(0.04)1(0.08)1(0.16)0(0.32) Step 0.04, can be set from 0.4 to 1 0000–1111 I protection (transient short circuit protection) Electronic MCCB current setting Step 0.5, can be set from 1 to 10 I = 1 - 1.5 - 2 - 2.5- 3 - 3.5 - 4.5-...
Page 41
Initial Configuration Parameters of the Electric Heater Temperature Controller for Air Inlet Windows Category Item Default Value Value Range Factory Setting Remarks Specified value –55°C to 99°C 25°C Temperature difference 2.0°C 0.1°C to 25°C 20°C Anti-frequent–startup delay 0–50 min Adjustment parameters Probe error, compressor running time 0–99 min Probe error, compressor stop time...
Page 42
No.C001 Cooling Device Layout Diagram Air outlet window Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm UPS-2 UPS-1 RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT CRAC-B1 CRAC-C1 Fan-2 CRAC-A1 CRAC-D1 (With Electric Heating & (With Electric Heating & (25KW) (25KW) Fan-1...
Page 43
Table 2 Initial Configuration Parameters for Cooling Devices Initial Configuration Parameters of Remote Temperature and Humidity Sensor DIP Switches for In-row Air Cooled Smart Cooling Product DIP Switch Sequence No. Sensor Name and No. Address Remote humidity and temperature sensor 1...
Page 44
Initial Teamwork Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Number of Cold aisle Hot aisle Teamwork Teamwork Teamwork Total Number Rotation Rotation Forced Requirement Cascade Cooling Network Running Rotation temperature and temperature and Group No. Unit Address Function of Units Period Time...
Page 45
Initial Temperature and Humidity Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Cooling Product Humidifier& electric heater Cold aisle sensor 1 Temperature and humidity control type Temp control mode Cold-aisle temp set point Cold-aisle Humid Set Point Disable Maximum Enable Average Enable...
Page 46
No.M001 Monitoring Device Layout Diagram With shock-absorbing cradle for IT RACKs Air outlet window Door Status Sensor-1 DOOR Door Status Sensor-2 DOOR Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm Magnetic Lock-1 UPS-2 UPS-1 Light-1 Exit Button-1 DOOR EXIT BREAK GLASS...
Page 47
No.M002 Monitoring System Network Diagram Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved LAN Switch Server Reserved Server_Mgmt Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Door Status Sensor-1 Reserved Reserved LOCAL FIRE Extinguishant Control Panel (CE) FAULT RELAY ECC800 BACK Collector_ECC800 Reserved...
Page 48
02313CXG Server 2288X V5 https://192.168.9.11 User name:admin 1 or 2 LAN Switch Port1 User name:root Password: Password:Changeme_123 Huawei@123 2. PowerEcho maintenance tool: IP address of the https://Neteco server: 31945/ User name:admin Password:Changeme_123 WAN_1:192.168.8.10 WAN_2:192.168.0.10 Collector_ECC8 Collector_ECC User name:admin LAN_1、LAN_2:192.168.248.10 02312PYX ECC800-A2 https://192.168.9.12...
Page 49
Port to Upper- WebUI User Upper- Monitoring Data Device Device Device IP Device Alarm LCD User Name and Upper- Level Device Model Name and Transfer Level Remarks Device Type Name Name Address Address Threshold Password Level Device Password Port Device Device Port Collector_ECC8...
Page 50
After a camera is commissioned, label the camera with its name and IP address. Remarks: Camera commissioning: Obtain the IP address automatically allocated by the ECC800 to the camera through Huawei IPC TOOL. Then access the camera on the WebUI over Remarks: the IP address to configure the internal IP address.
Page 51
No.F001 Fire Extinguishing Device Layout Diagram (CE) With shock-absorbing cradle for IT RACKs Air outlet EXIT-1 window Emergency Lighting -2 EXIT Fire Alarm Bell-1 Horn Strobes-1 Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS-2 UPS-1 Smoke Detector-1 Smoke Detector-2 Smoke Detector-3...
Page 52
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -1 Horn Strobes -2 Horn Strobes -1 Terminal Resistor Warning Signs-1 Terminal Resistor Terminal Resistor 6.8K 6.8K SILENCE SILENCE COMM+LEV1 LEV2 2WIRE COMM+ LEV1 LEV2 2WIRE Terminal Resistor pneumatic switch-1 6.8K Fire Alarm Bell-1 Extinguishant Abort Button To Monitoring system 6.8K...
Page 53
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -2 Smoke Smoke Smoke Smoke Smoke Detector-1 Detector-5 Detector-4 Detector-3 Detector-2 L1 IN L1 IN L1 IN L1 IN L1 IN Terminal Resistor 6.8K L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT black black...
Page 54
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -3 AC PDB-1 Relay AC PDB-1 DC24V- DC24V+ black black DATA POWER ZONE 1 ZONE 2 ZONE 3 MODE HOLD EXTING EXTRACT FAULT LOCAL FIRE REMOTE SOUNDER STAGE STAGE SELECT RELEASE PRESS PRESS RELAY FIRE RELAY...
Page 55
No.L001 Lighting Device Layout Diagram Air outlet window Lighting-25 Lighting-26 Lighting-27 Lighting-28 Lighting-29 Lighting-30 Lighting-31 Lighting-32 Lighting-33 Lighting-16 Lighting-17 Lighting-18 Lighting-19 Lighting-20 Lighting-21 Lighting-22 Lighting-23 Lighting-24 UPS-2 UPS-1 Lighting-15 Signal window Power window Power PDB-1 XSEC0014-XSEC0014...
Page 56
No.F003 Emergency Exit Diagram With shock-absorbing cradle for IT RACKs Air outlet window Exit Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS-2 UPS-1 CRAC-B1 CRAC-C1 Fan-2 CRAC-A1 CRAC-D1 (With Electric Heating & (With Electric Heating & (25KW) (25KW) Fan-1...
Page 58
List of Initial Configuration Parameters Category Diagram ID Diagram Name Detailed Initial Configuration Parameters No.P001 Power Supply and Distribution Device Layout Diagram No.P002 Power Supply and Distribution System Diagram MCCB Current Parameter Settings Initial Configurations for the Power Supply and Initial Configuration Parameters of the Electric Heater Temperature Controller Distribution System for Air Conditioner Pipes...
Page 59
No.P001 Power Supply and Distribution Device Layout Diagram Air outlet window WY-10A WY-10A Socket-2(PAD) Socket-1(Right for maintenance) UPS-2 UPS-2 UPS-1 UPS-1 Fan-2 Fan-1 Power PDB-1 XSEC0014-XSEC0014...
Page 60
No.P002 Power Supply and Distribution System Diagram AC PDB-1 Air Conditioner distribution Module IT Load 1 distribution Module IT Load 2 distribution Module IT Load 2 distribution Module IT Load 1 distribution Module Air Conditioner distribution Module BBB-1 MCB C32A/4P MCB C32A/4P In=20kA, In=20kA,...
Page 61
Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices Device Name Project Configuration Quantity Power Distribution Device Name Remarks Integrated UPS ■Involved □Not involved UPS-1/2 MCCB ■Involved □Not involved UPS-1/2 QF Electric heating ■Involved □Not involved Electric heating Note: The following device parameters are not all parameters of the devices.
Page 62
Component UPS-1/2 Integrated UPS (25 kVA-125 kVA) Initial Configuration Parameters Default Parameter Category Value Range Setting Remarks Value 12 languages, including English, Language English English Chinese, Italian, and so on Basic Password Default value Single/Parallel Single Single, Parallel Single Output voltage level 400 V 380 V, 400 V, 415 V 380 V...
Page 63
Default Category Parameter Value Range Setting Remarks Value User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Eable Disable/Enable/User-defined branch circuit breaker in the Installation time PDU > Branch Battery conceptual enable diagram and enable the branch circuit breaker that connects to a load.) User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Eable...
Page 64
Component UPS-1/2 QF MCCB Current Parameter Settings Category Parameter Default Value Value Range Setting Remarks 0000–1111 L overload protection (DIP switch setting) 1111 0(0.04)1(0.08)1(0.16)0(0.32) Step 0.04, can be set from 0.4 to 1 0000–1111 I protection (transient short circuit protection) Electronic MCCB current setting Step 0.5, can be set from 1 to 10 I = 1 - 1.5 - 2 - 2.5- 3 - 3.5 - 4.5-...
Page 65
Initial Configuration Parameters of the Electric Heater Temperature Controller for Air Conditioner Pipes Category Item Default Value Value Range Factory Setting Remarks Specified value –55°C to 99°C 40°C Temperature difference 2.0°C 0.1°C to 25°C 5.0°C Anti-frequent–startup delay 0–50 min Adjustment parameters Probe error, compressor running time 0–99 min Probe error, compressor stop time...
Page 66
Initial Configuration Parameters of the Electric Heater Temperature Controller for Air Inlet Windows Category Item Default Value Value Range Factory Setting Remarks Specified value –55°C to 99°C 25°C Temperature difference 2.0°C 0.1°C to 25°C 20°C Anti-frequent–startup delay 0–50 min Adjustment parameters Probe error, compressor running time 0–99 min Probe error, compressor stop time...
Page 67
No.C001 Cooling Device Layout Diagram Electric heating for door 2 Air outlet window Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm UPS-2 UPS-1 RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT Electric heating for door 1 CRAC-B1 CRAC-C1 Fan-2...
Page 68
Table 2 Initial Configuration Parameters for Cooling Devices Initial Configuration Parameters of Remote Temperature and Humidity Sensor DIP Switches for In-row Air Cooled Smart Cooling Product DIP Switch Sequence No. Sensor Name and No. Address Remote humidity and temperature sensor 1...
Page 69
Initial Teamwork Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Number of Cold aisle Hot aisle Teamwork Teamwork Teamwork Total Number Rotation Rotation Forced Requirement Cascade Cooling Network Running Rotation temperature and temperature and Group No. Unit Address Function of Units Period Time...
Page 70
Initial Temperature and Humidity Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Cooling Product Humidifier& electric heater Cold aisle sensor 1 Temperature and humidity control type Temp control mode Cold-aisle temp set point Cold-aisle Humid Set Point Disable Maximum Enable Average Enable...
Page 71
No.M001 Monitoring Device Layout Diagram With shock-absorbing cradle for IT RACKs Electric heating for door 2 Air outlet window Door Status Sensor-1 DOOR Door Status Sensor-2 DOOR Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm Magnetic Lock-1 UPS-2 UPS-1 Light-1...
Page 72
No.M002 Monitoring System Network Diagram Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved LAN Switch Server Reserved Server_Mgmt Reserved Reserved Reserved Reserved Reserved Reserved Reserved Reserved Door Status Sensor-1 Reserved Reserved LOCAL FIRE Extinguishant Control Panel (CE) FAULT RELAY ECC800 BACK Collector_ECC800 Reserved...
Page 73
LAN Switch 02313CXG Server 2288X V5 https://192.168.9.11 User name:admin 1 or 2 Port1 User name:root Switch Password: Password:Changeme_123 Huawei@123 2. PowerEcho maintenance tool: IP address of the https://Neteco server: 31945/ User name:admin Password:Changeme_123 WAN_1:192.168.8.10 WAN_2:192.168.0.10 User name:admin Collector_ECC8 Collector_ECC8 LAN_1、LAN_2:192.168.248.10...
Page 74
Port to WebUI User Upper- Monitoring Data Device Device Device IP Device Alarm LCD User Name and Upper- Upper-Level Device Model Name and Transfer Level Remarks Device Type Name Name Address Address Threshold Password Level Device Port Password Port Device Device Collector_ECC8 User name:Admin...
Page 75
After a camera is commissioned, label the camera with its name and IP address. Remarks: Camera commissioning: Obtain the IP address automatically allocated by the ECC800 to the camera through Huawei IPC TOOL. Then access the camera on the WebUI over Remarks: the IP address to configure the internal IP address.
Page 76
No.F001 Fire Extinguishing Device Layout Diagram (CE) With shock-absorbing cradle for IT RACKs Electric heating for door Air outlet window EXIT-1 Emergency Lighting -2 EXIT Fire Alarm Bell-1 Horn Strobes-1 Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS-2...
Page 77
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -1 Horn Strobes -2 Horn Strobes -1 Terminal Resistor Warning Signs-1 Terminal Resistor Terminal Resistor 6.8K 6.8K SILENCE SILENCE COMM+LEV1 LEV2 2WIRE COMM+ LEV1 LEV2 2WIRE Terminal Resistor pneumatic switch-1 6.8K Fire Alarm Bell-1 Extinguishant Abort Button To Monitoring system 6.8K...
Page 78
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -2 Smoke Smoke Smoke Smoke Smoke Detector-1 Detector-5 Detector-4 Detector-3 Detector-2 L1 IN L1 IN L1 IN L1 IN L1 IN Terminal Resistor 6.8K L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT black black...
Page 79
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -3 AC PDB-1 Relay AC PDB-1 DC24V- DC24V+ black black DATA POWER ZONE 1 ZONE 2 ZONE 3 FAULT LOCAL FIRE REMOTE MODE HOLD EXTING EXTRACT SELECT RELEASE PRESS PRESS CONTROL STATUS UNITS SOUNDER STAGE STAGE...
Page 80
No.L001 Lighting Device Layout Diagram Air outlet window Lighting-25 Lighting-26 Lighting-27 Lighting-28 Lighting-29 Lighting-30 Lighting-31 Lighting-32 Lighting-33 Lighting-16 Lighting-17 Lighting-18 Lighting-19 Lighting-20 Lighting-21 Lighting-22 Lighting-23 Lighting-24 UPS-2 UPS-1 Lighting-15 Signal window Power window Power PDB-1 XSEC0014-XSEC0014...
Page 81
No.F003 Emergency Exit Diagram With shock-absorbing cradle for IT RACKs Electric heating for door Air outlet window Exit Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS-2 UPS-1 Electric heating for door 1 CRAC-B1 CRAC-C1 Fan-2 CRAC-A1 CRAC-D1 (With Electric Heating &...
Page 83
List of Initial Configuration Parameters Category Diagram ID Diagram Name Detailed Initial Configuration Parameters Power Supply and Distribution Device Layout No.P001 Diagram No.P002 Power Supply and Distribution System Diagram Initial Configurations for the Power Supply and Distribution System Initial Configuration Parameters of the Electric Heater Temperature Controller for Air Inlet Windows (Optional) Initial Configuration Parameters for Power Supply Table 1...
Page 84
No.P001 Power Supply and Distribution Device Layout Diagram Air outlet window WY-10A WY-10A Socket-2(PAD) Socket-1(Right for maintenance) UPS-2 UPS-1 Fan-2 Fan-1 Power PDB-1 XSEC0014-XSEC0014...
Page 85
No.P002 Power Supply and Distribution System Diagram Air Conditioner distribution Module IT Load 1 distribution Module IT Load 2 distribution Module IT Load 2 distribution Module IT Load 1 distribution Module Air Conditioner distribution Module Fuse1 Fuse2 Fuse3 Fuse4 Fuse5 Fuse6 BAT+ BAT N...
Page 86
Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices Device Name Project Configuration Quantity Power Distribution Device Name Remarks Integrated UPS ■Involved □Not involved UPS-1/2 Electric heating ■Involved □Not involved Air Intake Window Electric Heater Note: The following device parameters are not all parameters of the devices. Only the parameters that need to be set for the project are listed. Default values will be used for the other parameters so they do not need to be set.
Page 87
Component UPS-1/2 Integrated UPS (20kVA-80kVA) Initial Configuration Parameters Default Parameter Category Value Range Setting Remarks Value 12 languages, including English, Language English English Chinese, Italian, and so on Basic Password 000001 Default value Single/Parallel Single Single, Parallel Single Output voltage level 208V 208V、220V、230V 208V...
Page 88
Default Category Parameter Value Range Setting Remarks Value User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Enable Disable/Enable/User-defined branch circuit breaker in the Installation time PDU > Branch Battery conceptual enable diagram and enable the branch circuit breaker that connects to a load.) User-defined (After setting the parameter to User-defined, disable the spare PDU Parameters-Branch breaker open alarm Enable...
Page 89
Initial Configuration Parameters of the Electric Heater Temperature Controller for Air Inlet Windows Category Item Default Value Value Range Factory Setting Remarks Specified value –55°C to 99°C 25°C Temperature difference 2.0°C 0.1°C to 25°C 20°C Anti-frequent–startup delay 0–50 min Adjustment parameters Probe error, compressor running time 0–99 min Probe error, compressor stop time...
Page 90
No.C001 Cooling Device Layout Diagram Air outlet window Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm UPS-2 UPS-1 RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT RS485_IN RS485_OUT CRAC-B1 CRAC-C1 Fan-2 CRAC-D1 CRAC-A1 (With Electric Heating & (With Electric Heating & (25KW) (25KW) Fan-1...
Page 91
Table 2 Initial Configuration Parameters for Cooling Devices Initial Configuration Parameters of Remote Temperature and Humidity Sensor DIP Switches for In-row Air Cooled Smart Cooling Product DIP Switch Sequence No. Sensor Name and No. Address Remote humidity and temperature sensor 1...
Page 92
Initial Teamwork Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Number of Cold aisle Hot aisle Teamwork Teamwork Teamwork Total Number Rotation Rotation Forced Requirement Cascade Cooling Network Running Rotation temperature and temperature and Group No. Unit Address Function of Units Period Time...
Page 93
Initial Temperature and Humidity Configuration Parameters for In-row Air-Cooled Smart Cooling Product Smart Cooling Product Humidifier& electric heater Cold aisle sensor 1 Temperature and humidity control type Temp control mode Cold-aisle temp set point Cold-aisle Humid Set Point Disable Maximum Enable Average Enable...
Page 94
No.M001 Monitoring Device Layout Diagram With shock-absorbing cradle for IT RACKs Air outlet window Door Status Sensor-1 DOOR Door Status Sensor-2 DOOR Opening direction Slide 200mm Slide 200mm Opening direction Opening direction Slide 200mm Magnetic Lock-1 UPS-2 UPS-1 Light-1 Exit Button-1 DOOR EXIT BREAK GLASS...
Page 95
No.M002 Monitoring System Network Diagram Reserved Door Status Sensor-1 LOCAL FIRE Extinguishant Control Panel (CE) FAULT RELAY ECC800 BACK Collector_ECC800 Reserved FIRE RELAY Extinguishant Control Panel (CE) Door Status Sensor-2 Smart ETH Gateway-3 Smart ETH Gateway-2 Smart ETH Gateway-1 Reserved PWR_IN PWR_OUT PWR_IN...
Page 96
Table 3 Initial Configuration Parameters for the Management System Port to WebUI User Upper- Monitoring Data Device Device IP Device Alarm LCD User Name and Upper- Upper-Level Device Name Device Model Name and Transfer Level Remarks Device Type Name Address Address Threshold Password...
Page 97
Port to WebUI User Upper- Monitoring Data Device Device IP Device Alarm LCD User Name and Upper- Upper-Level Device Name Device Model Name and Transfer Level Remarks Device Type Name Address Address Threshold Password Level Device Port Password Port Device Device Collector_ECC8 Normal: open...
Page 98
After a camera is commissioned, label the camera with its name and IP address. Remarks: Camera commissioning: Obtain the IP address automatically allocated by the ECC800 to the camera through Huawei IPC TOOL. Then access the camera on the WebUI over Remarks: the IP address to configure the internal IP address.
Page 99
No.F001 Fire Extinguishing Device Layout Diagram (CE) With shock-absorbing cradle for IT RACKs Air outlet window EXIT-1 Emergency Lighting -2 EXIT Fire Alarm Bell-1 Horn Strobes-1 Opening direction Slide Slide Opening direction Opening direction Slide 200mm 200mm 200mm UPS-2 UPS-1 Smoke Detector-1 Smoke Detector-2 Smoke Detector-3...
Page 100
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -1 Horn Strobes -2 Horn Strobes -1 Terminal Resistor Warning Signs-1 Terminal Resistor Terminal Resistor 6.8K 6.8K SILENCE SILENCE COMM+LEV1 LEV2 2WIRE COMM+ LEV1 LEV2 2WIRE Terminal Resistor pneumatic switch-1 6.8K Fire Alarm Bell-1 Extinguishant Abort Button To Monitoring system 6.8K...
Page 101
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -2 Smoke Smoke Smoke Smoke Smoke Detector-1 Detector-5 Detector-4 Detector-3 Detector-2 L1 IN L1 IN L1 IN L1 IN L1 IN Terminal Resistor 6.8K L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT L1 OUT black black...
Page 102
No.F002 Fire Extinguishing System Conceptual Diagram (CE) -3 Transformer PDB-1 ALUK-2.5B QF6-11 QF6-12 Dry contacts QF6-13 QF6-14 KA-8 DC24+ Fire cut off DC24- KA-7 black black DATA POWER ZONE 1 ZONE 2 ZONE 3 MODE HOLD EXTING EXTRACT FAULT LOCAL FIRE REMOTE SOUNDER...