Huawei FusionModule1000A Commissioning Manual page 36

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
Table 6-1 Checking after power-on
System
Power supply
and distribution
system
Cooling system
Management
system
Issue 02 (2019-12-20)
Check Item
Check
Sub-item
Integrated UPS
MDU
Air cooled
Remote
precision smart
temperature and
cooling product
humidity (T/H)
sensor
Controller
Monitoring
Camera
device
ECC800
collector
Smart ETH
gateway
AC actuator
WiFi converter
Access control
Pre-fab. module
system
door
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
Criteria
The screen is free from erratic
display or missing characters.
Settings meet the requirements
of the current scenario.
The mains and bypass input
and output voltage, power,
frequency, current, power
factor, electricity energy, and
switch status are properly
displayed.
There is no active alarm whose
severity is higher than minor.
If there are any alarms, record
and handle the alarms.
The DIP switch settings are
the same as the initial settings.
The screen is free from erratic
display or missing characters,
and displays no alarm.
The teamwork settings are the
same as the initial settings.
The red indicator inside the
camera is on.
The power indicator on the
main control board is on.
The indicator on the power
module is green.
The PWR and RUN indicators are
on.
The PWR, RUN, and RF_Z
indicators are on.
The RUN and WiFi indicators are
on, and the WPS indicator is off.
The magnetic lock indicator is
green when the pre-fab.
module door is closed.
The magnetic lock indicator is
red when the pre-fab. module
door is open.
The pre-fab. module door can
29