FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
The gas release indicator turns on at the same time.
(1) Red and black cables to the pressure
announciator
Step 9 Commission the emergency start/abort switch.
Issue 02 (2019-12-20)
Figure 7-8 Short-circuiting the pressure announciator terminals
Copyright © Huawei Technologies Co., Ltd.
7 System Commissioning
(2) Cables to the fire alarm control
panel
41