4.
----End

7.5 Fire Extinguishing System Commissioning (CE)

Prerequisites
Preparations
Tools: multimeter, smoke pistol, heating device, flat-head screwdriver, Phillips screwdriver,
step ladder
Issue 02 (2019-12-20)
Figure 7-17 Removing the safety pin
Reinstall the removed screws and tighten all screws.
The extinguishant control panel has been powered on.
The management system is working properly.
Before commissioning the fire extinguishing system, remove the electrical actuator from
the container valve of the fire cylinder. This prevents the extinguishant release due to
misoperations, and prevents accidental damage during the commissioning. After the
commissioning of the fire extinguishing system, reinstall the container valve to the
electrical actuator.
To avoid damage to the heat detector, keep a proper distance between the heating device
and the heat detector during the commissioning.