Step 11 Press RESET to reset the fire alarm control panel.
Step 12 (Optional) Check whether the fire alarm signals are reported to the management system.
Step 13 Reconnect cables to the electromagnetic valve.
Issue 02 (2019-12-20)
Figure 7-12 Smoke detector installation reference line
Figure 7-13 Heat detector installation reference line