Preparing For The Fire Extinguishing System Power-On Commissioning - Huawei FusionModule1000A Commissioning Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
Step 2 Understand the connections of the management system by referring to the monitoring device
networking diagram.
Step 3 Understand the initial configurations of the management system by referring to the
management system initial configuration table.
The passwords and parameters must be the same as those in the initial configuration
parameter manual for the solution in use.
----End
4.7 Preparing for the Fire Extinguishing System Power-On
Commissioning
Prerequisites
The FusionModule1000 has been installed.
Preparations
Tools: none
Documents: fire extinguishing device layout diagram, fire extinguishing system conceptual
diagram
Skill requirement: fire engineer
For the diagrams and tables, see the initial configuration parameter manual for the solution in
use.
Procedure
Step 1 Understand the layout of fire extinguishing devices by referring to the fire extinguishing
device layout diagram.
Step 2 Understand the running of the fire extinguishing system by referring to the fire extinguishing
system conceptual diagram.
----End
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
4 Preparations for Power-On Commissioning
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

V200r003c10

Table of Contents