Complete Rebooting Sequence - Universal Robots E Series Service Manual

Robot arm
Hide thumbs Also See for E Series:
Table of Contents

Advertisement

6.5 Complete rebooting sequence.

To completely reboot the robot system, follow the following steps:
To completely reboot, do
the following...
Step 1
Power down the Control Box
Step 2
Disconnect the main power
Step 3
Completely de-energize the
robot and Control Box.
Step 4
Reconnect the main power.
Step 5
Power on the Control Box and Robot Arm.
The Control Box and Robot Arm has now been
completely rebooted.
All rights reserved
NO
140
Push the power button on the
Teach Pendant and follow the
onscreen instructions
OR
Send power off command to
controller or inputs via I/O's
Disconnect the main power to
the Control Box by
disconnecting the plug from the
mains socket.
Press and hold the power
button on the Teach Pendant
for 5 seconds.
OR
Send power on signal via I/O for
5 seconds
Reverse actions in Step 2
Push the power button on the
Teach Pendant and follow the
onscreen instructions
OR
Send power on signal via I/O's
Service Manual e-Series (EN) 1.1.8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ur3eUr5eUr10eUr16e

Table of Contents