OceanStor V5 Series
Parts Replacement
Tools and Materials
●
●
●
Procedure
Step 1 Check status before replacement.
1.
2.
You can proceed to next steps only when all items pass the pre-replacement check
and the replacement page is displayed. If any item fails, rectify the fault as
prompted.
Step 2 Wear an ESD wrist strap.
Step 3 Press the latch on the assistant cooling unit to release the handles and pull out
the assistant cooling unit, as shown in
Issue 15 (2019-12-30)
ESD wrist strap
ESD bag
Labels
Check system status.
Start SmartKit and choose Home > Storage > Routine Maintenance >
Health Check. On the Health Check page, perform inspection as instructed.
For details, see
7.1.2 Checking System
If any items fail the inspection, rectify the faults by performing the recommended
actions in the inspection reports. Ensure that all other parts except the parts to be
replaced are working properly.
Check the status of the parts to be replaced.
Start SmartKit and choose Home > Storage > Parts Replacement > Parts
Replacement. On the Parts Replacement page, click FRU Replacement.
Then complete the check before the replacement as prompted. For details, see
7.1.3 Replacing an
NO TICE
Copyright © Huawei Technologies Co., Ltd.
Status.
FRU.
Figure
7-66.
7 Replacing FRUs
210