6.6.2.3
Go online and start the configuration wizards
Procedure with STARTER
Proceed as follows to start the quick commissioning of the inverter:
1. Select your project and go online:
2. In the following screen form, select the inverter with
which you wish to go online.
3. Download the hardware configuration found online in
your project (PG or PC).
Significance of the symbol in front of the inverter:
(A) The inverter is online.
(B) The inverter is offline
4. When you are online, double-click on "Control Unit".
5. Start the commissioning wizard:
You have started the quick commissioning of the inverter.
6.6.2.4
Carrying out quick commissioning
Procedure
Proceed as follows to carry out quick commissioning:
1.
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257324B AE
.
Select the control mode.
Selecting the control mode (Page 75)
Commissioning
6.6 Basic commissioning
85