Generating A Starter Project; Go Online And Perform The Basic Commissioning - Siemens SINAMICS G120 Operating Instructions Manual

Frequency converter
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

4.5.2

Generating a STARTER project

Creating a STARTER project using project wizards
• Using "Project / New with
• To start the wizard, click on
• The wizard guides you through
4.5.3

Go online and perform the basic commissioning

Going online
• In the next screen form, select the device or the
• In the next screen form, download the hardware
• STARTER shows you which converters it is accessing online and which are offline:
• Start the wizard for the basic commissioning.
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2011, FW 4.4, A5E02299792B AB
wizard" create a new project.
"Search online for drive
units ...".
all of the settings that you need
for your project.
Select your project and go online:
devices with which you want to go online.
If you want to go online via the USB interface, then
set the access point to "DEVICE".
configuration that you found online into your project
(PG or PC).
The converter is offline
The converter is online
If you are online, open the screen form of the Control Unit.
4.5 Commissioning with STARTER
.
Commissioning