Table 4- 4
Number
1
2
3
4
5
6
7
8
Requirements
Note
National Fire Protection Association (NFPA) compatibility
These devices are only certified for installation in industrial machines in accordance with the
"Electrical Standard for Industrial Machinery" (NFPA79).
Due to their design features, it is possible that these devices cannot be installed in
accordance with the National Electrical Code (NFPA70).
Note
It is only permissible to use temperature-resistant copper cables for at least 75 °C.
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257324B AE
Assignment of the main power connections on the frequency converter
Connection X1
HAN Q4/2 (male)
Phase L1
Phase L2
Phase L3
Not assigned
--
--
--
--
PE
4.10 Wiring the ET200pro system
Connection X2
HAN Q8/0 (female)
U
Not assigned
W
Brake (-)
Temperature sensor (+)
Brake (+)
V
Temperature sensor (-)
PE
Installation
Connection X3
HAN Q4/2 (female)
Phase L1
Phase L2
Phase L3
Not assigned
--
--
--
--
PE
51