HPE 3PAR StoreServ 8000 Service And Upgrade Manual page 28

Hide thumbs Also See for 3PAR StoreServ 8000:
Table of Contents

Advertisement

Figure 21: Installing the battery, AC power cooling module, controller node enclosure
13. Install the AC PCM.
a. On the ESD mat, extend the PCM handle to the open position, and then carry it to the enclosure.
b. Slide the PCM into the enclosure and then push until the insertion mechanism starts to engage
(the handle starts to rotate).
Ensure that no cables get caught in the PCM insertion mechanism.
c. Close the handle until the latch clicks to fully seat the PCM in the enclosure.
d. Once inserted, pull back lightly on the PCM to ensure that it is properly engaged.
Figure 22: Installing the AC power cooling module
14. Connect the power cable and turn on the power to the AC PCM.
a. Reconnect the power cable.
b. Slide the cable clamp onto the cable tie.
c. Tighten the clamp.
d. Move the power switch to the on position.
Verification
28
Service

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents