Figure 29: Steps To Installing The Switch With A Plywood Base - Allied Telesis GS950 PS V2 Series Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for GS950 PS V2 Series:
Table of Contents

Advertisement

Chapter 5: Installing the Switch on a Wall
Wall Studs
Step 1: Install
the plywood
base on the
wall.
Step 2: Install
the switch on
the plywood
base.
62
You should install the plywood base to the wall and then install the switch
on the base. Refer to Figure 29.
Plywood
Base
Wall
Figure 29. Steps to Installing the Switch with a Plywood Base

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs950/10ps v2Gs950/18ps v2Gs950/28ps v2Gs950/52ps v2

Table of Contents