Installing The Switch On A Plywood Base; Figure 41: Installing Brackets On The Switch - Allied Telesis x530DP Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.5.1-2.1
Table of Contents

Advertisement

Installing the Switch on a Plywood Base

After the plywood base for the switch has been installed on the wall, install
the switch. See "Reviewing Safety Precautions" on page 78 and
"Choosing a Site for the Switch" on page 83 before performing this
procedure. Allied Telesis recommends a minimum of two people for this
procedure.
Warning
The device is heavy. Always ask for assistance before moving or
lifting it to avoid injuring yourself or damaging the equipment.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment can result if it is not properly fastened to the wall. 
E105
To install the switch on the plywood base, perform the following procedure:
1. Place the switch on a table.
2. Install four wall/equipment rack brackets to the sides of the unit
with the sixteen M4x6mm screws included with the switch. Refer to
Figure 41.
Figure 41. Installing Brackets on the Switch
3. After attaching the brackets, have another person hold the switch on
the plywood base on the wall while you secure it with the M4x32.3mm
screws included with the switch. Refer to Figure 42 on page 116 for the
switch.
x530DP Series Installation Guide for Virtual Chassis Stacking
115

Advertisement

Table of Contents
loading

This manual is also suitable for:

X530dp-28ghxmX530dp-52ghxm

Table of Contents