Beckman Coulter AutoMate 2500 Series Instructions For Use Manual page 67

Sample processing system
Hide thumbs Also See for AutoMate 2500 Series:
Table of Contents

Advertisement

2
Locate a new secondary tube container.
3
Place the container with tubes on a clean workplace. Confirm that the open side is
facing up.
4
Unwrap the container.
5
Check the tube direction before loading the container. Use the sticker on the top front of
the container as a guide:
6
Position the metal tube container over the open tube container and slide it down
completely. Do not leave any space.
B67471B
Run the System
Aliquot Module Operation
2
2-31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Automate 1250Automate 2550Automate 1200

Table of Contents