Run the System
Actions During Distribution
The system automatically confirms placements on the input drawer. The input drawer
turns green to confirm the status.
Figure 2.4 Open input drawer - start inserting tubes at this position
Load New Tubes
1
Wait until the AutoMate system has distributed all tubes on the input drawer. The
drawer opens automatically when all input racks are empty.
2
Replace empty racks with full ones. Avoid gaps between tubes in racks. Fully loaded
racks are not mandatory. Close the drawer.
2-24
Note
Robot 1 stops processing a rack after detecting three consecutive positions without
a tube. A Beckman Coulter representative can change the number of positions if
necessary.
B67471B