Figure 2.5 Workplace is full and drawer opens automatically
2
While the drawer is open:
a. Remove the tubes or full racks from the workplace.
b. Add empty racks as needed.
c. Select the workplace on screen. The workplace color changes to green.
Figure 2.6 Workplace selected
3
Continue routine operation.After you close the drawer, the system distributes tubes
from position 1. Position 1 is the start position for this example workplace and can be
defined for each workplace.
4
Close the drawer. The workplace is cleared and available for tube distribution. Confirm
that the workplace displayed on screen matches the workplace on the drawer.
Note
Remove Single Tubes or Racks that are not Finished
1
Select the button on screen to open the drawer.
B67471B
After you close a drawer without confirming a workplace, the system keeps the
layout of distributed tubes and continues distributing from the next available
position.
Run the System
Actions During Distribution
2
2-27