Beckman Coulter AutoMate 2500 Series Instructions For Use Manual page 48

Sample processing system
Hide thumbs Also See for AutoMate 2500 Series:
Table of Contents

Advertisement

Run the System
Start the System
7
Confirm that all hardware components in the System Communication Status section of
the GUI are green, which indicates successful initialization.
8
Minimize the camera window with the checkered background by touching anywhere on
the main screen other than the checkered box. Closing the window causes an error
message when the first tube reaches the camera.
9
Begin loading tubes in input racks, from left to right and back to front, in the position
shown by the arrow. Avoid leaving positions empty in the racks.
2-12
Note
For guidance on any software messages during initialization, refer to
Troubleshooting,
Software Messages During
Initialization.
B67471B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Automate 1250Automate 2550Automate 1200

Table of Contents