Before starting the device, the following preconditions must be satisfied:
Mount the SENTRON PAC5100/5200 as described in Chapter 5.2.
Connect the lines for measurement, communication and supply voltage as described in Chapter 5.3 and
observe the safety provisions.
Switch on the devices needed for the measurement.
Switch on the supply voltage of the SENTRON PAC5100/5200.
Check whether the LEDs at the SENTRON PAC5100/5200 signal that the device is ready (see
Chapter 12.3).
The following picture is displayed while the device is being initialized after switching on the supply voltage:
Figure 8-1
Once the device has initialized, the currently selected screen with measured values is displayed.
NOTE
The following pictures only show the display without the front view of the device.
194
SIEMENS
Start Screen
SENTRON PAC5100/5200, 7KM5212/5412, Device Manual
E50417-H1040-C568-A1, Edition 03.2015

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentron pac5100

Table of Contents