11 Failures and LED Indications

11.1 General Inspection

11.1
General Inspection
Visual Inspection
If function failures occur, first check the device visually. Observe the following points when inspecting the device
visually:
Correct installation of the device as described in Chapter 5.2 at the intended location
Compliance with the environmental conditions specified in Chapter 12.1.4 of the technical data
Correct connection of supply voltage and grounding conductors according to Chapter 5.3
Correct connection of measuring and communication lines according to Chapter 5.7.1
Function Checks
Additionally, check the following aspects:
Functioning of the display according to Chapter 8.4 and good visibility of the display
Correct functioning of peripheral devices (e.g. connected PC, series-connected current transformers)
Compliance with the system requirements specified in Chapter 5.4
Compliance with the access rights according to Chapter 5.5
Compliance with the commissioning sequence of the device according to Chapter 5.7
Evaluation of the LED failure indications, see Chapter 11.3.
218
SENTRON PAC5100/5200, 7KM5212/5412, Device Manual
E50417-H1040-C568-A1, Edition 03.2015

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentron pac5100

Table of Contents