E-8
400/480 Volt ProBlue Adhesive Melters
Prepare the Transformer for Installation
Figure E‐3
Preparing the transformer
Part 1024496_06
See Figure E‐3.
1. Remove the transformer lid.
NOTE: The lid is connected to the transformer by a ground lead.
2. Disconnect the ground lead from the sub‐base.
3. Turn both locking screws counter‐clockwise until they stop.
4. Remove the transformer from the sub‐base by pulling the transformer
forward approximately
See Figure E‐4.
5. Attach the 400‐volt plug (P/N 1039789/Black wires) or the 480‐volt plug
(P/N 1039790/White wires) to the power distribution module.
1
/
inch, and then lifting it clear of the sub‐base.
2
2
1
E 2014 Nordson Corporation