Nordson ProBlue P4 Customer Product Manual page 41

Adhesive melters
Table of Contents

Advertisement

E 2014 Nordson Corporation
WARNING! Risk of electrical shock or short circuit. Use the cable clamp that
is provided or use electrical conduit to protect the power cable from the sharp
edge of the conduit knockout.
4. Install the cable clamp in the PG‐21 conduit knockout.
5. Route the power cable between the power disconnect switch and the
melter and through the cable clamp. Tighten the cable clamp.
CAUTION! Before setting the melter down onto the sub‐base, ensure that
both locking srews on the front chassis of the melter are turned fully
counterclockwise until they stop.
6. Carefully lower the melter onto the sub‐base so that the back of the
melter is approximately
7. Slide the melter to the rear of the sub‐base until the rear locking tabs
enter the slots in the back of the melter.
8. Lock the melter to the sub‐base by turning each of the locking screws,
which are located in the front of the melter, clockwise until they stop.
1
/
inch in front of the rear locking tabs.
2
3-11
Installation
Part 1024496_06

Advertisement

Table of Contents
loading

This manual is also suitable for:

Problue p10Problue p7

Table of Contents