Unpacking The Melter; Contents Of The Installation Kit; Customer‐Supplied Materials - Nordson ProBlue P4 Customer Product Manual

Adhesive melters
Table of Contents

Advertisement

3-8
Installation

Unpacking the Melter

Contents of the Installation Kit

Customer‐Supplied Materials
Part 1024496_06
Before starting the installation, remove the melter from the pallet, locate the
installation kit, and inspect the melter for damaged and missing parts. Report
any problems to your Nordson representative.
The installation kit provided with the melter contains the components shown
in Figure 3‐3. The quantity and type of hose fittings provided in the kit
depends upon the melter's model number and configuration.
NOTE: 400/480 volt transformers are shipped with a separate installation kit.
Refer to Appendix E for information about the contents of the transformer
installation kit.
The installation kit also contains a package of safety label overlays that are
printed in a variety of languages. If required by local regulations, the
appropriate language overlay should be applied over the English version of
the same label. Refer to Section 1, Safety Labels and Tags, for the location
of each safety label.
NOTE: P10 melters also include a manifold guard kit P/N 1031871.
The following additional materials are also required to install the melter.
S
A power cable. If the cable clamp that is provided in the installation kit
is not used, rigid or flexible electrical conduit will be required.
S
5
Four 8 mm (
/
in.) machine bolts with locking hardware
16
S
A plant air supply with an in‐line isolation valve
E 2014 Nordson Corporation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Problue p10Problue p7

Table of Contents

Save PDF