Chapter 3: Unpacking and Setting Up the Instrument
Before unpacking and setting up the SpectraMax Paradigm Multi-Mode Detection Platform,
prepare a dry, flat work area that has sufficient space for the instrument, host computer,
and required cables. See
Unpacking and setting up the instrument includes the following procedures:
Unpacking the instrument and saving the original packaging. See
Instrument on page
Removing the transport locks from the microplate drawer, the detection cartridge
drawer, and the PMT shutter. See
Connecting the instrument cables and installing the controlling software. See
the Instrument Cables on page
Unlocking the instrument using the controlling software. See
SpectraMax Paradigm Instrument on page
You can also connect a gas supply line to the rear of the instrument.See
Disconnecting a Gas Supply on page
5014038 E
Instrument Specifications on page
63.
Removing the Transport Locks on page
72.
75.
76.
167.
Unpacking the
67.
Connecting
Unlocking the
Connecting and
3
61
Need help?
Do you have a question about the SpectraMax Paradigm and is the answer not in the manual?