Control Cable Installation; Shift Cable Adjustment - Evinrude E-TEC E40DRLSCB Service Manual

Table of Contents

Advertisement

Route shift and throttle cables and electrical har-
ness through grommet in lower motor cover. Con-
nect harness to engine wiring harness.
Rope Start models
1. Electrical harness connector
Tiller Electric models
1. Electrical harness connectors
Use tie strap to secure harness to throttle body
bracket.
1
1. Bracket
TILLER HANDLE SERVICE – LONG HANDLE

Control Cable Installation

IMPORTANT:
ment of cables to shift and throttle levers until all
cables, wires, and hoses have been routed and
grommet has been placed into the lower engine
cover.
1

Shift Cable Adjustment

Pull firmly on shift cable casing to remove back-
lash. With outboard and tiller handle shift lever in
NEUTRAL, place the cable trunnion into the lower
anchor pocket. Adjust the trunnion nut so the cas-
ing fits onto the shift lever pin.
002511
1
1
1. Shift lever pin
2. Trunnion nut
Secure shift cable to the shift lever pin. For proper
001999
installation, review the following steps:
Place washer on pin.
Position retainer clip with straight section on the
bottom and angled section on the top.
Use long nose pliers to insert straight section of
clip into linkage pin hole.
Push the clip towards the hole while lifting on
the curved end with the pliers.
Be sure retainer clip fully engages the pin.
Lock the retainer by moving the angled section
behind the straight section.
006314
Locked Retainer Clip
1. Angled section behind straight section
MIDSECTION
DO NOT complete final attach-
2
002100
12
1
DP0817a
269

Advertisement

Table of Contents
loading

Table of Contents