Cylinder Head Installation - Evinrude E-TEC E40DRLSCB Service Manual

Table of Contents

Advertisement

IMPORTANT:
Be sure gap of ring fits squarely
around dowel pin.
IMPORTANT:
Before continuing, make sure that
all Gel-Seal II has been removed from the cylinder
block and crankcase mating flanges. If traces of
hardened Gel-Seal II are left, main bearings could
be misaligned. Refer to CYLINDER BLOCK
CLEANING on p. 210.
Coat pistons, rings, cylinder walls, and Ring Com-
pressor, P/N 336314, with outboard lubricant.
Center connecting rod in piston and locate piston
rings on dowel pins. Place appropriate ring com-
pressor on piston.
Slide piston and rod assembly into the correct cyl-
inder, as marked during disassembly. Guide con-
necting rod through cylinder block to avoid
scratching cylinder wall.
1. Ring compressor
Repeat steps for each piston.

Cylinder Head Installation

Install a new thermostat seal in cylinder head with
side marked "TO CYL HEAD" facing toward ther-
mostat.
Refer to THERMOSTAT SERVICING on p. 196
before installing cylinder head.
Lightly lubricate new cylinder head O-rings with
Triple-Guard grease and install in cylinder head.
002048
Apply soapy water to water dam and insert into
block.
1
1
1. Water dam
002059
POWERHEAD
POWERHEAD ASSEMBLY
002061
002062
11
217

Advertisement

Table of Contents
loading

Table of Contents