Evinrude E-TEC E40DRLSCB Service Manual page 228

Table of Contents

Advertisement

POWERHEAD
POWERHEAD INSTALLATION
Place the shift rod in the shift rod lever. Install the
retaining pin and washer. Tighten pin to a torque
of 60 to 84 in. lbs. (7 to 9.5 N·m).
1. Shift rod screw
Check shift linkage adjustment. Refer to Shift
Linkage Adjustment on p. 227.
IMPORTANT:
Make sure the gearcase shifts
solidly into both forward and reverse and that pro-
peller shaft spins freely in neutral.
Apply Nut Lock to threads of exhaust water valve
screws and tighten to a torque of 60 to 84 in. lbs.
(7 to 9.5 N.m).
1. Exhaust water valve
226
Connect cooling water hoses to exhaust housing.
1
1. Overboard indicator hose
2. Drain hose
002171
Connect the power trim connectors and exhaust
water valve connector (60, 65). Secure cables in
clamps.
R
S
OPE
TART
Install recoil starter ratchet and housing on out-
board. Refer to RECOIL STARTER INSTALLA-
TION on p. 317.
1
1
1
1. Starter housing screws (3)
Install the lower engine covers. Refer to LOWER
004293
COVER SERVICE on p. 82.
M
ODELS
1
2
004298
1
002515

Advertisement

Table of Contents
loading

Table of Contents