11. Recalibrate the Measured Color Gamut Data (MCGD) settings following the procedure provided
in the CP2208-LP User Manual (P/N: 020-102150-XX).

Replacing fold mirror two

Fold mirror two is located underneath the illumination optic system (IOS).
Estimated time to replace: 16 minutes.
1. Turn off the lamp and cool the projector for at least 15 minutes.
2. Turn off the projector and disconnect it from AC power.
3. Remove the top skin (on page 32).
4. Remove the IOS (on page 80).
5. Remove one of the screws from each of the three tabs on fold mirror two.
Wear gloves when you handle the fold mirror.
6. Loosen the remaining screws from each of the three tabs.
7. Hold the mirror in place and swing the tabs out to the side.
8. Carefully lower the mirror to remove it.
9. To replace the fold mirror, complete these steps in reverse order.
When reinstalling the fold mirror, make sure the reflective surface faces inward.

Replacing the light module

The light module provides the light source for the projector.
Estimated time to replace: 85 minutes.
1. Turn off the light and cool the projector for at least 15 minutes.
2. Turn off the projector and disconnect it from AC power.
3. Remove the exhaust panel skin (on page 38).
4. Remove the rear skin (on page 37).
5. Disconnect the inline connectors of the PH HSINK TOP (fan 11) and PH HSINK BOT (fan 12)
fans.
CP2208-LP Service Manual
020-102263-01 Rev. 1 (09-2016)
Copyright
2016 Christie Digital Systems USA Inc. All rights reserved.
©
Optics
70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents