Installing A Hot-Swappable Power Supply - HPE Integrity rx2800 i2 series User's & Service Manual

Table of Contents

Advertisement

2. To install the hard drive, push in the drive and then close the locking lever.

Installing a hot-swappable power supply

The server has at least one hot-swappable power supply installed before shipping. This power supply is
located at the rear of the server. You can install a second, optional power supply to provide 1+1 capability.
Figure 14: Power supply loading guidelines
Power supply bay 2
Power supply bay 1
CAUTION:
Observe all ESD safety precautions before attempting this procedure. Failure to follow ESD safety
precautions might result in damage to the server.
CAUTION:
If you do not purchase a second power supply, the empty power supply slot must remain covered
with the supplied power supply blank. Failure to observe this caution might result in server
shutdown due to overheating.
58
Installing a hot-swappable power supply

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ah395-9013j

Table of Contents