Pedestal Kit Installation - HPE Integrity rx2800 i2 series User's & Service Manual

Table of Contents

Advertisement

Search for "Integrity rx2800 i2 server" and click the product link for more information and
QuickSpecs.

Pedestal kit installation

If you order the rackless configuration option, the server ships with a pedestal mount. The pedestal mount
is packaged in a separate carton that is attached to the server carton.
Remove the rails from the server
I If your server has rails when you receive it, you need to remove the rails before mounting it in the
pedestal kit. To remove the component:
Procedure
1. Slightly pull the rail lock away from the rail to unlock the rail. See Removing the rails from the server
2. Slide the rail toward the front of the server to disengage the rail from the posts on the server.
3. Repeat these steps for the rail on the other side of the server.
Figure 7: Removing the rails from the server
Attaching the pedestal kit top and bottom
IMPORTANT:
In this document the server top, bottom, right and left refer to the server as faced from the front with
the server in a horizontal orientation. The pedestal kit components are referred to by the final
position with the server in a vertical orientation. For example, the pedestal kit bottom attaches to the
server right side
Pedestal kit installation
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ah395-9013j

Table of Contents