Cable management arm with right-hand swing
NOTE:
To access some components, you might have to remove the cable management arm.
To access the product rear panel components, open the cable management arm:
Procedure
1. Power off the server (Powering off the server on page 138).
2. Swing open the cable management arm.
3. Remove the cables from the cable trough.
4. Remove the cable management arm.
Removing and replacing a power supply blank
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
To remove the component:
144
Cable management arm with right-hand swing
Need help?
Do you have a question about the Integrity rx2800 i2 series and is the answer not in the manual?
Questions and answers