9. Remove shipping edge trim (A).
10. Close the shields (B) over the two shipping tie-down
holes and tighten nuts (C).
11. Remove shipping wire banding and protective
packing (A) from hydraulic hoses.
214367
ASSEMBLING THE HEADER
Figure 3.28: Top Shield Cover
Figure 3.29: Shipping Material around Hoses
21
C
A
A
B
A
Revision A