Installing Gauge Rollers (Optional) - MacDon R85 Assembly Instructions Manual

Rotary disc 4.9-meter (16-foot) self-propelled windrower header
Table of Contents

Advertisement

3.3 Installing Gauge Rollers (Optional)

NOTE:
This kit may be installed later in the assembly sequence, but installation may be easier prior to laying the header
down.
1. Unpack gauge roller bundle and install gauge rollers.
Refer to instruction supplied with kit.
214367
ASSEMBLING THE HEADER
Figure 3.5: Gauge Roller (Right Side Shown –
Left Side Similar)
10
Revision A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents