Table .16 Predelivery Checklist (continued)
ü ü Item
Grease all bearings and drivelines.
Check conditioner roll gap and timing.
Check if roll intermesh hardware is securely tightened.
Check if cutterbar curtains are hanging properly.
Check hydraulic hose and wiring harness routing.
Check cutterbar area carefully for loose parts and
hardware on the cutterbar.
WARNING
These objects can be ejected with considerable
force when the machine is started, and may result in
serious injury or machine damage.
Run-Up Procedure
Check hydraulic hose and wiring harness routing for
clearance when raising or lowering header.
Check that hazard lights are functional.
Post Run-Up Check. Stop Engine.
Check belt drives for idler alignment and heated bearings.
Check for hydraulic leaks.
Check that header manuals are storage compartment on
the right side of the header.
Date Checked:
214367
REFERENCE
Reference
3.15 Lubricating the Header, page 75
4.5 Checking Conditioner Rolls, page 88
4.5 Checking Conditioner Rolls, page 88
3.7 Unpacking Curtains, page 18
4.11 Running up the Header, page 96
4.9 Checking Lights, page 94
4.1 Checking Drive Belts, page 81
4.10 Checking Manuals, page 95
Checked by:
112
Revision A