MOTO GUZZI 2Q000297 Service Station Manual page 81

Table of Contents

Advertisement

V7 III ABS
Central part
TABLE A - CONDUIT ON THE FRAME
Check that the relays (1) are well in-
serted
Fasten the rear part of the conduit us-
ing a large clamp (2)
TABLE A1
Pass the connector of the voltage reg-
ulator (1) and the horn connector (2) in
the hole created by the conduit with the
frame at the bottom, to facilitate their
connection
Electrical system
ELE SYS - 81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents