Identifying the motor data and optimizing the closed-loop control

The inverter has several techniques to automatically identify the motor data and optimize the
speed control.
To start the motor data identification routine, you must switch-on the motor via the terminal
strip, fieldbus or from the operator panel.
Risk of death due to machine motion while motor data identification is active
For the stationary measurement, the motor can make several rotations. The rotating
measurement accelerates the motor up to its rated speed. Secure dangerous machine
parts before starting motor data identification:
• Before switching on, ensure that nobody is working on the machine or located within its
• Secure the machine's work area against unintended access.
• Lower hanging/suspended loads to the floor.
Preconditions
● You selected a method of motor data identification during quick commissioning, e.g.
measurement of the motor data while the motor is stationary.
When quick commissioning is complete, the inverter issues alarm A07991.
● The motor has cooled down to the ambient temperature.
An excessively high motor temperature falsifies the motor data identification results.
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
Complete quick commissioning:
17.1. Switchover the display using an arrow key: nO → YES
17.2. Press the OK key.
WARNING
working area.