5.3.3
Starting quick commissioning
Carrying out quick commissioning
Preconditions
Procedure
Proceed as follows to carry out quick commissioning:
1.
2.
3.
4.
5.
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2016, FW V4.7 SP6, A5E34259001B AC
• The power supply is switched on.
• The operator panel displays setpoints and actual values.
Press the ESC key.
Press one of the arrow keys until the BOP-2 displays the "SETUP" menu.
In the "SETUP" menu, press the OK key to start quick commissioning.
If you wish to restore all of the parameters to the factory setting before
the quick commissioning:
4.1.
Switchover the display using an arrow key: nO → YES
4.2.
Press the OK key.
When selecting an application class, the inverter assigns the motor
control with the appropriate default settings:
STANDARD
DYNAMIC
EXPERT
5.3 Quick commissioning using the BOP-2 operator panel
Standard Drive Control (Page 135)
Dynamic Drive Control (Page 138)
If you select this setting or if no application class is
listed:
Expert (Page 141)
Commissioning
133