Introduction; Site Requirements; Physical Operating Environment; Power Connection - Christie Roadie 4K35 Service Manual

Hide thumbs Also See for Roadie 4K35:
Table of Contents

Advertisement

Introduction

This document provides technical information for assisting Christie qualified technicians in the
servicing of the Roadie 4K35 and 4K45 projectors .
Every effort has been made to make sure the information in this document is accurate and complete.
However, due to continuing research all information is subject to change without notice. Christie
assumes no responsibility for omissions or inaccuracies.

Site requirements

To safely install and operate the projector, the installation location must have restricted access for
authorized personnel only and meet these minimum requirements.

Physical operating environment

Provides specifications for the operating environment.
Maximum ambient temperature (operating) 35°C (95°F)
Minimum ambient temperature (operating) 10°C (50°F)

Power connection

Learn the requirements for permanently wired installations or power cord connections.
Single phase 10A IEC320C14 (lamp power supply to projector head)
or
Single phase 15A (North America)/10A (all other regions) power cord (projector head to AC
mains). The latter cord is provided for installations where the projector head is remotely
lcoated from the lamp power supply (LPS) and must be powered directly from the AC mains
instead of the LPS.
Terminal block, electrician hard-wired at the projector headlamp power supply (LPS).
Three-phase, 39A 200-230VAC + Earth (North America and Japan)
or
Three-phase, 26A 380-415VAC + Neutral + Earth (regions outside North America and Japan)
This product can be connected to an IT power distribution system.
Roadie 4K35 and 4K45 Service Manual
020-101694-03 Rev. 1 (01-2016)
Copyright
2016 Christie Digital Systems USA Inc. All rights reserved.
©
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Roadie 4k45

Table of Contents