Service Guidelines; Ordering Parts; Interconnections And Line Drawings; Replacing Modules - Christie Roadie 4K35 Service Manual

Hide thumbs Also See for Roadie 4K35:
Table of Contents

Advertisement

Service guidelines

Review safety guidelines and information required for replacing modules.

Ordering parts

When ordering replacement parts, quote the part numbers of the items required. Quote the projector
model number, serial number, and date of manufacture, as indicated on the license label.
Not all parts are available separately. In addition, some parts stocked as inventory are available only
until the current supply lasts.
All part numbers are subject-to-change.
Related information
Site requirements (on page 7)

Interconnections and line drawings

The interconnect diagram illustrates the path of electrical connections between modules.
Manufacturer's part numbers are included. Part numbers are subject to change.
Line drawings provide projector dimensions and sizes for installation.
To download the latest interconnect diagram or line drawings, visit www.christiedigital.com.

Replacing modules

To ensure you have the correct module and the projector module is replaced correctly, check module
markings, parts lists, and the relevant disassembly and replacement procedures.
Components must be replaced with exact equivalents. Failure to do so may result in unsafe operation.
Related information
Site requirements (on page 7)
Roadie 4K35 and 4K45 Service Manual
020-101694-03 Rev. 1 (01-2016)
Copyright
2016 Christie Digital Systems USA Inc. All rights reserved.
©
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Roadie 4k45

Table of Contents