Endress+Hauser Proline Prosonic Flow B 200 Operating Instructions Manual page 57

Ultrasonic transit time flowmeter
Hide thumbs Also See for Proline Prosonic Flow B 200:
Table of Contents

Advertisement

Proline Prosonic Flow B 200 HART
Endress+Hauser
10
Commissioning
10.1
Function check
Before commissioning the measuring device:
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist →  23
• "Post-connection check" checklist →  32
10.2
Switching on the measuring device
After a successful function check, switch on the measuring device.
 After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" →  105.
10.3
Setting the operating language
Factory setting: English or ordered local language
X X X X X X X
X
XX
Main menu
 15
Taking the example of the local display
X
20.50
XX
0104-1
Language
English
Operation
Setup
Language
English
Ã
Deutsch
Español
Français
Language
Ã
English
Deutsch
Español
Français
Commissioning
0104-1
0104-1
Hauptmenü
0104-1
Sprache
Deutsch
Betrieb
Setup
A0013996
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents